Buildmaster Foundations Pvt Ltd

BMF - BLUE BELLS

BMF ­- SUN LIGHT

BMF Homes & Developers

BMF - MOON LIGHT

BMF - BLUE MOON

M/S.Buildmaster Foundations Pvt Ltd., - Blue Moon

.....................................................................................................................................................................................................................................................................................................................

 

 

Area Details in SFT
Flat G1 G2 F1 F2 F3 S1
Area 715 790 870 925 495 735
UDS 379 Sft 419 Sft 461 Sft 266 Sft 262 sft 389 Sft

PROJECT LOCATION

This Project is located Just Nearby Jaya Engineering College and Very Near to Chennai - Thiruvallur Main Road.

 

Payment Details

At the time of Booking

:

25%

On Completion of Basement

:

30%

At the time Brick Work

:

15%

On Completion of Respective Roof Slab

:

15%

At the time of Plastering

:

10%

15 Days before handing over the Flat

:

5%

 

Extra Expenses In Addition to Flat Cost

  • Stamp Duty and Registration of the undivided share of land/ total area of flat will be borne by the client.
  • Legal fees, document charges and incidental charges payable at Registrar Office will be borne by the client.
  • Covered Car parking will be charged extra (If Available).
  • Necessary deposits and incidental expenses for Electricity Service Connection will be borne by the clients.

General Specifications

  • Structure: R.C.C. Columns and Beams with Brick Work, Plastered inside and Outside.

  • Doors & Windows : Main Door with Teak Wood Frames and Other Doors Country Wood Frames with Compressed Panel Shutters for all. Windows are Country Wood with M.S. Grills and Glazed Shutters.

  • kitchen : Black Granite Platform with S.S. Sink & Ceramic tiles 2’0” height.

  • Flooring : Joint free tiles 24” x 24” for hall & 16” x 16” for other rooms with 4” Skirting.

  • Bathroom : Ceramic Tiles Flooring and Walls Dado up to 7’0” height.

  • Wall Painting : Internal Walls finished with wall patty and painted with Distemper and External walls finished with external emulsion paint.

  • Electrical : Concealed wiring for Three Phase Supply, Adequate Fan, Light and A.C. Points as desired.

  • Plumbing : All Plumbing work with PVC Pipes and Fittings with ISI Brand.

  • Water Supply : One Sump to Receive Township Water and Two Bore well for tapping Ground Water and Two Over Head Tank.

  • Drainage : One Septic Tank with Adequate Soil lines with PVC Pipes.