Buildmaster Foundations Pvt Ltd

BMF - BLUE BELLS

BMF ­- SUN LIGHT

BMF Homes & Developers

BMF - MOON LIGHT

BMF - BLUE MOON

M/S. Buildmaster Foundations Pvt Ltd., - Blue Bells

.....................................................................................................................................................................................................................................................................................................................

 

 

Area Details in S.FT
Block - A Block - B
First Floor First Floor

F1 - 840 Sft

F2 - 765 Sft

F3 - 710 Sft

F1 - 840 Sft

F2 - 790 Sft

F3 - 680 Sft

UDS - 450 Sft

UDS - 410 Sft

UDS - 380 Sft

UDS - 450 Sft

UDS - 423 Sft

UDS - 365 Sft

Second Floor Second Floor

S1 - 840 Sft

S2 - 765 Sft

S3 - 710 Sft

S1 - 840 Sft

S2 - 790 Sft

S3 - 680 Sft

UDS - 450 Sft

UDS - 410 Sft

UDS - 380 Sft

UDS - 450 Sft

UDS - 423 Sft

UDS - 365 Sft

 

Payment Details

At the time of Booking

:

20%

On Completion of Basement

:

30%

At the time Brick Work

:

15%

On Completion of Respective Roof Slab

:

20%

At the time of Plastering

:

10%

15 Days before handing over the Flat

:

5%

 

Extra Expenses In Addition to Flat Cost

  • Stamp Duty and Registration of the undivided share of land for the flat.

  • Covered Car Parking will be charged extra.

  • Necessary deposits and incidental expenses for Electricity Service Connection will be borne by the clients.

General Specifications

  • Structure : R.C.C. Columns and Beams with Brick Work, Plastered inside and Outside.

  • Doors & Windows : Main Door with Teak Wood Frames and Other Doors Country Wood Frames with Compressed Panel Shutters for all.Windows are Country Wood with M.S.Grills and Glazed Shutters.

  • kitchen : Black Granite Platform with S.S.Sink & Ceramic tiles 2’0” height.

  • Flooring : Joint free tiles 24” x 24” for hall & 16” x 16” for other rooms with 4” Skirting.

  • Bathroom : Ceramic Tiles Flooring and Walls Dado upto 7’0” height.

  • Wall Painting : Internal Walls finished with wall patty and painted with Distember and External walls finished with external emulsion paint.

  • Electrical : Concealed wiring for Three Phase Supply, Adequate Fan, Light and A.C.Points as desired.

  • Plumbing : All Plumbing work with PVC Pipes and Fittings with ISI Brand.

  • Water Supply : One Sump to Receive Township Water and Two Bore well for tapping Ground Water and Two Over Head Tank.

  • Drainage : One Septic Tank with Adequate Soil lines with PVC Pipes.